Over the Door Organizer 3 Pack

Original price was: $39.99.Current price is: $12.00.

80 People watching this product now!
Description

MEASURE BEFORE BUYING: The over-the-door hook width is 1.73 inches-please ensure your door thickness is less than 1.6 inches. Also, verify your pantry or cabinet door has enough depth to accommodate the baskets comfortably when closed. 2-WAY USAGE: Designed for versatile use-hang over a door or mount directly to the wall. Ideal for maximizing vertical storage in tight spaces like pantry doors, utility closets, or laundry rooms. QUICK & EASY ASSEMBLY: Ships flat-packed for easy transport. No tools needed for over-the-door setup-just snap the panels together and hang. All hardware included for both door-hanging and wall-mount options. DURABLE & BUILT-IN LABEL PLATES: These hanging wire baskets are made with sturdy 2.5mm and 3.5mm metal wires and holds up to 11 lbs (33 lbs total). Each basket includes a label plate for easy organization. GREAT SIZE: Individual basket- 13.01″L x 5.53″W X 10.24″H (30.7″H when connected).